Warehousing for a plastics factory undertaken by Director Wayne Mitchell completed in in 2018. The site had an established production building with existing inadequate, non-complying storage areas. the site had several challenges including an overland flow path that had to be maintained that divided the production and ideal location for the warehousing. Through the design process we negotiated with council to bridge the overland flow path which we utilised as a truck dock and dispatch area. 

Construction was undertaken following a selected tender process and was completed on time and budget.